The Monday Morning Building Product Advisor
|
It wasnât the GC or the ownerâs rep. It was me. I had my argument ready, but I didnât push hard enough. Iâve spent some time trying to understand why.
The best explanation I can find doesnât really flatter me⌠or any of us.
In the 1960s, researchers started testing a simple idea: how do people choose between a reward they can get soon and a bigger one they can get later? They expected a clear answer, but it wasnât that simple.
George Ainslieâs work on this dates back to 1975, and the standard way to present his findings is to ask one question twice.
First time. Would you rather have $50 a year from now or $100 three years from now?
The majority of people go for the $50. Waiting two extra years for the larger sum just doesnât seem worthwhile.
Second time round. It was the same question, just both options were now three years further out. Would you rather have $50 in four yearsâ time or $100 in six yearsâ time?
A lot of those same people switched to the $100.
Letâs look at what really happened. The gap between the two choices stayed the same. Two years of waiting for an extra $50. The only thing that changed was how far away the decision felt.
And once it was far enough out, those two years of waiting didnât seem all that much anymore. So the larger number ultimately won.
In plain terms: things close to us are clearly different in size, and things farther away start to look pretty much the same.
Or put the way it actually stuck with me:
Once a cost is far enough away, it doesnât matter how big it is.
Now, letâs put that in the conference room I was in five weeks before the bidding phase.
$40,000 this month was a number everyone at the table could feel. A chalking south elevation in Year 6 wasnât a smaller number. It was just far enough away that none of us could feel the difference between it and nothing.
Itâs not because the savings are huge. Itâs because theyâre right here, right now, in front of us.
Iâm not saying VE is a villain here, by the way. Itâs a legitimate process, and itâs often the only reason a project gets built at all. The issue is actually narrower than that:
Only one side of the ledger has a number attached to it.
And hereâs what I actually want you to take from me sitting at that stoplight.
Every argument I made in that meeting was really just about preference. Our design team wanted to keep the better-looking panel. Thatâs a matter of taste. Taste loses to cost savings every time, and it should.
What I needed was someone in that room who could put a number on Year 6.
Nobody at that table could. The GC would be gone at closeout. The ownerâs rep was in the process of measuring that fiscal year. And I was playing the losing hand in the argument over aesthetics.
You (the product rep) would have been the only person in the room with that information.
You know what that lesser finish looks like at Year 6 in this climate on a south elevation, because youâve seen it on another building. Thatâs not a sales pitch. Thatâs the one piece of arithmetic no one else at the table has.
Of course, product reps arenât usually invited to the VE discussions.
But you can make sure the architect has the right information. An architect in a VE fight whoâs losing and gets a number, instead of just a feeling, to defend their design will always remember who gave it to them.
Of all the things Iâve shared in this newsletter, that technique is the one that can go wrong the fastest.
âYour building will fail.â Thatâs fearmongering. Itâs also usually not true, and we can smell it a mile away.
But what if the question is, âWhat does the ownerâs maintenance budget look like 6 years from now with that alternative?â Thatâs arithmetic. Now thatâs a number that the ownerâs rep can start to visualize and appreciate.
The difference isnât tone. Run two checks before you bring year six into a meeting.
Is it likely, or just possible? If you have to use the âworst caseâ to make your point, then you donât really have a point. Thatâs just a horror story, and thatâs what other reps do.
Are you asking it or announcing it? We looked at that a few issues ago. The number only works for architects (or any stakeholder) if weâre the ones who say it. Thatâs why posing it as a question works best.
Itâs not charm. Itâs not three years of relationship building. Itâs not a golf handicap. Itâs not about being the rep who knows my kidsâ names (though I have no objection to any of that).
Itâs a number you can probably get your hot little hands on this month, shared at the one moment in the project when it really matters.
Find a building with your product on it thatâs from somewhere around seven or eight years ago. Not a case study. A real building thatâs within driving distance.
Then go have a look at it. If itâs in another part of the country, ask a colleague to do it.
Stand in front of the different elevations. Take a photo of what you see (include the bits and details that your company would never put in a brochure). Ask whoeverâs maintaining it what it has cost them so far.
Or maybe you donât represent a visual item. In that case, find another metric to demonstrate superior functionality over time.
Whatever it is, now you have the number.
And the next time you have an architect who is likely heading toward a VE meeting, share those numbers with them. Then, youâre less likely to see your product slide onto the alternates list, since the architect wonât just be arguing taste during VE.
Theyâll be arguing arithmetic. And theyâll remember exactly who handed it to them.
â
That's it for this week!
Here's to building more than just buildings, and see you next week,
Neil Sutton
âArchitect | Speaker | The Product Rep Coach
=======
P.S. Do you really want inside an architect's head?
When youâre ready, there are 3 ways you can start working with me:
=======
âIf this was forwarded to you, go to â mmbpa-newsletter(dot)carrd(dot)co â so you donât miss the next lesson.
â=======
Connecting with architects should be simple. I'm a veteran architect (28+ years) who's been helping architectural product reps get even better at it for 11 years. So we're all working toward a stronger industry. Get the weekly insights by signing up here.
The Monday Morning Building Product AdvisorIssue #139 Back in 1974, two researchers showed 45 students a film of a car crash and then asked them one question: âAbout how fast were the cars going when they hit each other?â Except they didnât use the word âhitâ with everyone. Some heard âsmashed into.â Others heard âbumped,â âcollided with,â or âcontacted.â It was the same footage and the same crash, but only one word was different. Not the actual footage from the 1974 study The people who were...
The Monday Morning Building Product AdvisorIssue #137 Steadfast Steve, Part 2 We found ourselves 900 miles away in Wausau, Wisconsin, sitting at a table to review the shop drawings before they were officially submitted. If you missed last week, hereâs a quick recap⌠Steadfast Steve spent around 3 years helping our teams solve curtain wall details, often on projects he wasnât likely to win. When the research campus moved to phase two, he put in a substitution request for the new system he...
The Monday Morning Building Product AdvisorIssue #136 Steadfast Steve, Part 1 Our design team had a problem at the front door. We were working on a research tower for a big client in town, and our team wanted the main entrance to make a statement. They wanted the curtain wall to blend smoothly into the limestone. With no bulky frame where the glass met the stone. It looked great on paper, but it would be hard to make it happen during actual construction. âSteveâ sat at the end of our...