Last month, I opened up a spec section for a project that was finally ready to go out to bid.

The project had been on hold for over a year, so I’d finished the spec a long time ago. While updating and checking a few things, I was slightly horrified to find that one of the listed manufacturers had been acquired and several standard tests had changed. SpecLink flags some of those changes, but not all of them, which is how I ended up with that surprise.

That meant… I had to go through all my sections again to make sure nothing else had changed.

When I worked at a large international firm, we had a team dedicated to specs.

They kept the master specs up to date and improved them with every project. It’s been over 12 years since I worked there, so I’m not sure if they still do it that way. But it was definitely nice having someone focused on that job.

Since then, I’ve worked at a mid-sized firm and now at a small but fast-growing one. Usually, just a couple of us architects write the specs, on top of all the other plates we’re spinning. And if we’re overloaded, we’ll also work with a third-party spec consultant who will help write most of the sections.

Here’s why I’m bringing all this up.

At my last firm and the current one, we’ve used SpecLink.

You can set up proper master specs in the software and keep them up to date. We’ve talked about it more than once. But nobody has the time.

Like I said, plates spinning… yada, yada, yada

Anyway! The idea of having a master for each section just sits out there on our to-do list. And instead, most new projects start by pulling up the last project that used the section and carrying a lot of what was true in 2024 over into the next set of documents.

And then we use SpecLink to help catch any manufacturer or test changes.

Now imagine you’re the rep who emails asking for “access to your master spec.” Maybe you want a login or a meeting with whoever’s in charge. From our side, that just sounds like more work for a file we’re already putting off, so off it goes to the bottom of the pile.

[Nothing personal. It’s more that we’re embarrassed by how old ours is.]

A couple of weeks ago, a rep wrote in with this exact problem. He’d spent months trying to get a firm to look at his section, sending polite emails but getting nowhere.

I think product reps tend to picture the master spec as a vault with a guard at the door. With a lot of firms, it’s more like a box in the attic.

So, that changes what you should ask for…

Meet Bob. Every firm has someone like him.

He’s the project architect who got handed the specs because he’s careful, and he still has three projects in CDs. When Bob finally opens your section, he probably has 10 minutes before someone needs him for something else.

So don’t ask Bob for access. Instead, your best bet is to make sure his edit takes just 5 minutes.

The best way to do that is to create one page with three columns:

  • On the left, put the paragraph from his current section, exactly as it’s written. [You can usually find it in a bid set from one of the firm’s past jobs… or just ask for it.]
  • In the middle, add the paragraph as it should read now.
  • On the right, add a one-sentence reason for the change.

Hey! Where you going?!?
Don’t skip that last column!

You want to mark every change and give each one a one-line reason.

Something like: “Product discontinued.” Or, even better: “This is the corner that leaks when the flashing laps the wrong way.”

That second kind of reason sticks with us because it tells us what can go wrong between our drawings and the finished building. We rarely get that kind of insight anywhere else.

And finally, below the table, include the revised paragraph, formatted just like their spec and ready to paste. If Bob has to retype it, it’s going back into the box, never to be seen or heard from again.

One more thing about that paragraph:

A lot of sections list two or three manufacturers and end with “or approved equal.” Ask to be one of the named manufacturers. If you’re counting on getting in as “or equal,” you’re relying on a contractor to submit you and an architect to approve you, weeks after the real decisions are made.

And remember, getting your product’s name added to the list is a small edit for Bob. But if you’re asking to be the only name listed, it’s a big change and usually a bit too forward for the first date.

If the master spec is a dead end…

A door hardware rep who wrote in made an interesting point. More project architects are skipping the master and pulling sections from SpecLink one job at a time. He’s right. That’s exactly what a lot of firms do.

That’s where the owner or facility manager comes in.

If an owner already uses your product for every building, help them put it in writing as a design standard that’s given to every architect at kickoff. That way, when you meet the project architect, you can simply ask:

“Did you get the owner’s design standard for [door hardware, roofing, flooring, etc.]?”

Now you’re not asking to be let in. You’re helping us follow our client’s rules, and we appreciate reps who do that.

A rep outside the US asked how to get his brand onto an approved list. I don’t know every country’s process, so I’ll keep this simple…

Just ask whoever you’re talking to: “Who decides which brands are approved, and what would they need to see to add one?” Then bring whatever they say is needed and nothing more.

I’ve made the side-by-side into a one-page template you can fill out for your own section: The Five-Minute Edit Template​

If you try it, reply and let me know how Bob responded. I read every message.

​
That's it for this week!

Here's to building more than just buildings, and see you next week,

Neil Sutton
​
Architect | Speaker | The Product Rep Coach

=======

P.S. The easiest way to reach Bob is to have someone introduce you. The next time you help a project architect with a tricky detail, write up paragraphs for the corresponding specification sections to make sure it’s done right. Then ask the project architect, “Can I send this to whoever’s writing these sections so they match the detail?”

This way, your introduction to the spec writer has a reason.

And getting that intro from someone inside the firm gets you a much warmer welcome than a cold email ever could.

P.P.S. Do you really want inside an architect's head?

When you’re ready, there are 3 ways you can start working with me:

  • Product reps: If you want to be better at connecting with architects, reply, and let's chat.
  • Business owners or Team Leaders: You can book an Architect Connections Training for your team. Reply, and I'll send you the details.
  • Speaking: If you would like me to present at an upcoming group meeting, get in touch, and let’s talk!

=======
​
If this was forwarded to you, go to → mmbpa-newsletter(dot)carrd(dot)co ← so you don’t miss the next lesson.
​
=======

Monday Morning Building Product Advisor

Connecting with architects should be simple. I'm a veteran architect (28+ years) who's been helping architectural product reps get even better at it for 11 years. So we're all working toward a stronger industry. Get the weekly insights by signing up here.

Read more from Monday Morning Building Product Advisor

The Monday Morning Building Product AdvisorIssue #140 Last month, I was at a red light and looked up at a building I worked on some 8 or 9 years ago. The panels are chalking. They aren’t failing, just showing that dusty, faded look you see when a finish starts to wear out. It’s uneven, so the south side looks much older than the west. And I remember the exact meeting that caused it. It was a value engineering meeting about 5 weeks before bidding. As usual, we were over budget. There were 11...

The Monday Morning Building Product AdvisorIssue #139 Back in 1974, two researchers showed 45 students a film of a car crash and then asked them one question: “About how fast were the cars going when they hit each other?” Except they didn’t use the word “hit” with everyone. Some heard “smashed into.” Others heard “bumped,” “collided with,” or “contacted.” It was the same footage and the same crash, but only one word was different. Not the actual footage from the 1974 study The people who were...

The Monday Morning Building Product AdvisorIssue #137 Steadfast Steve, Part 2 We found ourselves 900 miles away in Wausau, Wisconsin, sitting at a table to review the shop drawings before they were officially submitted. If you missed last week, here’s a quick recap… Steadfast Steve spent around 3 years helping our teams solve curtain wall details, often on projects he wasn’t likely to win. When the research campus moved to phase two, he put in a substitution request for the new system he...